• 42 weeks from mobilization to mechanical completion
• Over 34,000 Manhours with Zero Safety Incidents
Greenfield-developed natural gas meter station with a maximum flow of 2400 mmscfd. The project includes (4) 20-inch ultra-sonic meter skids, (4) 16-inch flow/pressure regulator skids, (2) future meter connections, (2) future flow/pressure regulator connections, (4) 36” future interconnects, an RTU building, an instrument air system, and all associated piping.